Production operation sequence of cement block machine

- Oct 13, 2020-

Production operation sequence of cement block machine

 

1. The motor of the automatic variable shaft plug pump starts.

2. The valve of the feeder is opened and the feed is in place (must ensure that the mold frame is in the upper position)

3. The valve of the bottom feeder is opened to feed, and the material is moved by the motor (must ensure that the mold frame is in the lower position and the pressure head is in the upper position)

4. The feeding motor stops and the bottom feeding cart returns

5. The opening pressure head of the main oil cylinder valve is lowered (must ensure that the feeder is in the rear position)

6. Press head down

7. At the same time the indenter is pressed down and the table vibrates

8. The indenter is pressed down in place, and the vibration stops

9. The demoulding cylinder rises and the pressure head rises

10. The plate sending cylinder sends and ejects the plate.